| E-mail:
stephan1611@hotmail.com NATIONALITY: Swedish MARITAL STATUS: Married AREAS OF EXPERTISE Twenty two years experience as a engineer in the pulp and paper industry, waste treatment, steel mills, and water works. SUMMARY OF WORK EXPERIENCE Mechanical Engineer 3 Papermachines for Stadler-Hurter, Canada 1 TMP plant for HA Simons, Canada 1 board machine for Hurterfiber, Canada 4 Wet Ends(Top Wires) Black Clawson, Canada 1 Toxic Waste Plant for PBI, Indonesia New Town Freeport, Indonesia Process Engineer 3 papermachines for Stadler-Hurter, Canada 1 board machine for Hurterfiber, Canada 1 board machine for Cascade, Canada 1 papermachine IKPP Serang, Indonesia, 2 papermachines & 2 Wastepaperlines Pakerin, Indonesia Erection Manager 1 boardmachine for Cascade, Canada (workforce 650) 1 boardmachine & 4 Wastepaperlines Mondi,RSA (workforce 1200) 1 steelmill modernization KS, Indonesia, (workforce 350) Revamp of waterworks, Jakarta, Indonesia Erection Coordinator 2 Papermachines Tjiwi Kimia, Indonesia, Dismantling 2 Papermachines E.Hansson, Sweden Erection Supervisor Conversion of recovery boiler to power boiler, Setubal,Portugal Pulp Mill Kiani Kertas, Indonesia, (workforce 450) Pulp Mill PT TEL, Indonesia, 1999 Start-up Engineer 7 Wet-Ends & 1 PM for Black Clawson, Canada 1 board machine for Cascade, Canada 1 boardmachine & 4 Wastepaperlines Mondi, South Africa Proposal Engineer Export secondhand paper machines E.Hansson, Sweden, MEI contract for erection of a Pulp Mill and cement plants, Indonesia EMPLOYMENT HISTORY PT. TANJUNG ENIM LESTARI Responsibilities: Erection Supervisor at a bleached kraft pulp mill PT. KERTAS BKASI TEGUH March - April-1999 Indonesia Responsibilities: Project and maintenance engineer in a paper mill PT. INDOMUKTI MEKARJAYA KERTAS Sep 1997-Dec 1998 Indonesia Technical Manager Feasibility study for a papermill with one folding boxboard machine and one fine paper machine with two wastepaper lines and auxiliaries PT. VOEST-ALPINE DUTA March 1996 Oct 1997 Indonesia Project Engineer (Site Manager) Preparing proposals for MEI Contractor and Site Manager for steel mill modernization CONSULTANT ENGINEER Oct 1991 - March 1996 Indonesia Own business, specializing in project management, design engineering, and erection supervision. Client base included: PT Safege Waste water treatment plant PT Freeport New town design and engineering PT. Purna Bina Toxic waste plant Commonwealth Indo Boiler Sinar Hoperindo Paper mill Cipta Paperia Paper mill Gaya Baru Paper Paper mill Pura Barutama Paper mill Gede Karang Paper mill Triwahyu Sukses Paper mill PT. JAKKO POYRY Sept 1990 Oct 1991 Indonesia Project and Process Engineer: Assigned to PT. Sinar Dunia Makmur paper mill, West Java. Preparation of all flow sheets for test liner machine, control e of the piping design group, and erection supervision. JAAKKO POYRY PORTUGESA April - Sept 1990 Portugal Construction and Start-up Coordinator: Assigned to Portucel Company at Setubal, Portugal. In charge of the conversion of a recovery boiler to a bark-fired boiler. P.A.G. PAPER CONSULTANT LTD Feb 1989 - March 1990 South Africa Senior Mechanical Engineer Assigned to Mondi Board as Mechanical and Piping Engineer of a new Board. In charge of all aspects of construction, including mechanical, electrical, instrumentation and civil. Also responsible for commissioning of the plant. GLV - TROIS - RIVIERE (QC) July 1987 - Jan 1989 Canada Resident Engineer: Responsible for all engineering aspects and erection of a rebuilt board machine at Cascades, Jonquiere, Canada. H.A. SIMONS LTD Feb 1987 - June 1987 Canada Project Engineer: Preparation of pre-engineering studies and cost estimates for top former rebuilt, TMP reject and CTMP expansion. Montreal based. BLACK CLAWSON - KENNEDY LTD Dec 1985 - Jan 1987 Canada Project Engineer: Involvement in all stages of paper machine start up from mechanical erection to paper making. Responsibilities also included control of paper quality and machine operation follow up. ELOF HANSSON Sept 1984 Nov 1985 Sweden Project Manager: Preparation of proposals (technical and commercial) for second hand paper machines. Also responsible for liaison and co-ordinationor between dismantling companies, consultants and paper mills during execution of contracts. S.T.I.O NANTERRE FRANCE May 1983 - Aug 1984 France/Indonesia Site Manager: Site representative for S.T.I.O. at Tjiwi Kimia paper mill in Eastern Java, Indonesia. Also Start-up-Coordinator and Proposal Manager at Head Office in France. HURTERFIBER CONSULTANT Feb 1980 - May 1983 Canada/Egypt Project Engineer: Board machine rebuild as part of a major expansion at Rakta Mill, Alexandria, Egypt. SIMON TECSULT LTD March 1979 - Feb 1980 Canada Mechanical Engineer: Conceptual design of a thermo-mechanical pulp mill at Spruce Falls Power and Paper Co. Kapuskasing Ontario. STADLER-HURTER LTD April 1977 March 1979 Canada Mechanical Engineer: Input for design of a paper mill at Mazandaran, Iran. Preparation
of proposal for a coating plant at Letjes, Java. Feasibility study for Rakta Mill, Egypt. |